Natural Gas Services for Major US City – Utility Curtailment
CLEANCOR contracted with a major utility in the U.S. Northeast to provide an uninterrupted supply of natural gas via its mobile LNG regasification solution for the duration of a scheduled maintenance project.

Region: U.S. Northeast
Volume Demand:
- 150 MCFH
- Total Demand: 18,928 MCF
- 125 PSI at the inlet
Duration:
- Eight (8) Days
Equipment Setup:
LNG Storage:
- Four high pressure storage units
- Total of 44,000 LNG gallons of storage
- Two additional refueling units on standby
Vaporization/Regasification System:
- One large ambient vaporizer
- One large water bath vaporizer (full redundancy)
Compression Boosting System:
- Two (2) 300 HP Portable Compression Boosting Systems
Safety Systems:
- General Monitor Flame Detection System
- General Monitor Gas Detection System
Telemetry:
- Tank Level Monitoring System
Technical Services:
- CLEANCOR technical staff on site 24 hours per day
The project, planned two (2) months in advance, was anticipated to last a total of eight (8) days and required LNG supply of a minimum of 150 thousand cubic feet per hour (MCFH), 24 hours a day. CLEANCOR deployed four (4) high-pressure storage units with a total capacity of 44,000 gallons of LNG, with two (2) additional LNG transfer trailers used as refueling units to meet the daily volume demand. CLEANCOR successfully provided a consistent flow rate at the requested pressure of 125 pounds per square inch (PSI) at the inlet for the duration of the project. CLEANCOR’s technical staff members were on site 24 hours a day monitoring flow rates and receiving refueling deliveries until service to the area was restored.