Customer Curtailment & Natural Gas Supply

CLEANCOR was contracted by a large industrial processing plant on the West Coast U.S. to ensure the plant’s natural gas supply remained uninterrupted while the local unity performed planned maintenance on its natural gas pipeline. CLEANCOR worked with both the customer and the local utility to understand the duration of the temporary natural gas supply which was largely unknown by the local utility until work had started on the pipeline.

Customer Curtailment and Natural Gas Supply 960x447

Region: Northwest

Volume Demand:
- Peak Demand: 60 MCFH
- Daily Demand: 1.023 MMCF
- 60 PSI at the Inlet

Duration:
- 13 days

Emergency LNG Equipment Setup:
- LNG Storage: 22,000 LNG Gallons
- Mobile Vaporization/Regasification System
- Flame & Gas Detection System
- Telemetry – Tank Level Monitoring System


CLEANCOR delivered and connected its full redundant mobile LNG regasification equipment package to the customer’s location and supplied the required natural gas service to the plant for 13 days until utility service was restored. CLEANCOR’s pipeline resiliency solution saved the industrial processing plant over $1,000,000 per day in lost production during this timeframe.